Deploying High Density Rack Power to Support High Performance Computing in CityU

by Manfred Chan


City University of Hong Kong (hereafter CityU) aspires to become a leading global university, excelling in research and professional education. To address the growing needs arising from our strategic interdisciplinary research areas as laid out in our Strategic Plan 2020–2025, the Computing Services Centre (CSC) had built a centralised High Performance Computing (HPC) system (named CityU Burgundy) to provide state-of-the-art capability in computationally intensive research areas. It was first introduced in September 2021. Researchers from various disciplines had heavily used the HPC resources since the launch of the facility. In fact, some researchers had even decided to contribute their research funding to further expand the capability of the CityU Burgundy. 

The HPC IT workloads that spanned across eight racks with a power consumption of 15kW each (a total of 120kW) were protected by a 200kW Uninterruptible Power Supply (UPS) System. Along with the proliferation of compute-intensive workloads, the rack power requirements have also gone up.  In order to fully utilize the precious University Space, the CSC has deployed high-density racks that can support 50kW IT workloads per rack to replace the existing ones. The new high-power racks can support more powerful servers that provide the overall theoretical peak performance up to 1.7PFLOPS.

HighDensityRacks-1.png
?The layout of high-density racks for hosting HPC servers

High-density racks are not common. High power consumption will generate a lot of heat energy and in turn, requires stable cooling facilities. To the best of our knowledge, CityU is the first institution in Hong Kong to build a data centre with 50kW power per rack. The rack was designed to provide electric power with two power feeds, one from Normal and the other from UPS. There are sufficient intelligent PDUs to give the redundancy power supply to each compute HPC node. Each 50kW cabinet is equipped with an internal fire compression unit to protect the whole data centre even if there is a fire incident inside the high-density 50kW rack. The power consumption of each power outlet can be monitored remotely via the management network by the Data Centre Infrastructure Management (DCIM) system. The Operations team in the Network Operations Centre can monitor the system status and receive alerts if there is over-usage on the power consumption.

This is just the beginning. The CSC will continue to optimise its high-density data centre for HPC processing-intensive applications.  The key is to evaluate the current infrastructure from time to time and understand which technology will work best for them.

 

赌博百家乐赢钱方法| 杨公24山属性| 百家乐庄闲排列| 百家乐网站加盟| 百家乐官网真人游戏娱乐网| 广元市| 日博娱乐城开户| 百家乐赌博怎么玩| 百家乐官网博娱乐网赌百家乐官网的玩法技巧和规则 | 百家乐官网筹码币方形| 大发888官方hgx2dafa888gwd| 百家乐出老千视频| 百家乐看炉子的方法| 顶尖百家乐对单| 百家乐最新套路| 在线百家乐官网下| 网上真钱娱乐城| 威尼斯人娱乐城反水| 百家乐游戏规范| 新澳门百家乐官网的玩法技巧和规则| 真人百家乐官网蓝盾娱乐平台 | 元游棋牌游戏大厅下载| 百家乐游戏打水方法| 利高百家乐娱乐城| 百家乐编单短信接收| 百家乐翻天qvod| 百家乐怎么样投注| 百家乐游戏机分析仪| 网上玩百家乐有钱| 百家乐庄比闲多多少| 百家乐二十一点| 金三角百家乐的玩法技巧和规则| 大西洋百家乐的玩法技巧和规则| 百家乐真人游戏| 免费百家乐预测软件| 珠江太阳城广场| 大发888娱乐吧| 立博足球投注网| 网上百家乐网| 百家乐官网长玩必输| 百家乐官网视频游戏客服|