百家乐怎么玩-澳门百家乐官网娱乐城网址_网上百家乐是不是真的_全讯网888 (中国)·官方网站

Network Support for Remote Offices

by Dick Wong

 

Due to a shortage of space, the university is exploring various ways to accommodate new staff and academic programmes. One way of tackling this problem is to adopt a “core-satellite” approach. The “core” represents premises in the Kowloon Tong main campus while “satellite” refers to remote offices and learning centres outside of the main campus. As the number of remote offices and learning centres rises, CityU staff and students are now spread across a wide geographical area in Hong Kong (see map below).

 

As shown in the table below, these remote offices of varying sizes (indicated by the no. of computer outlets) have been around since 2008 and the total bandwidth allocated was normally determined by the number of users or computer outlets installed. But in some cases, departments may recommend the bandwidth themselves due to special needs.

More often than not, the Computing Services Centre (CSC) needs to rely on the Internet Service Provider (ISP) to provide the WAN links from the remote offices to the CityU’s main campus and the rental cost in general is proportional to the bandwidth subscribed. However, in the case of Festival Walk, the CSC had laid its own optical fibre cable between the CSC’s Computer Room and Festival Walk offices, consequently, the CSC was able to offer a higher bandwidth for Festival Walk than other remote offices without paying ISP any rental cost.

 

Remote campus location

Usage

Bandwidth

Computer Outlet

Installation Date

Chak On Market, Sham Shui Po

Staff office

20 Mbps

50

1-Jun-08

Festival Wallk, Kowloon Tong

Staff office

20 Gbps

500

2001

GrandTech, Shatin

Staff office

100 Mbps

20

25-Jul-08

InnoCentre, Kowloon Tong

Staff office

100 Mbps

400

1-May-08

Science Park, Tai Po

Staff office

1 Gbps

300

1-Feb-10

Ka Chi School, Shek Kip Mei

Staff office & learning centres

20 Mbps

60

15-Dec-08

ChinaChem Golden Plaza, TST

Staff office & learning centres

100 Mbps

300

1-Sep-10

Telford Annex, Kowloon Bay

Staff office & learning centres

100 Mbps

-

-

United Centre, Admiralty

Staff office & learning centres

20 Mbps

30

1-Oct-09

Every network, no matter how small, requires care in architecture, security, failover, and performance planning. One poorly designed and unmanaged remote campus can bring everyone down. In fact, the entire network team of the CSC will be involved in the following three stages when setting up a new network for remote offices:

  • IT planning: work with CDFO to identify IT needs and respective procurement for remote offices including planning, budgeting, design, tender, contract administration, site supervision and coordination
  • Project Implementation: monitor the progress of the structured cabling system installation and networking equipment installation including configuration, implementation, testing and acceptance of the network system
  • Ongoing support: supervise the cabling work as requested by departments and monitor the network status 24x7 to ensure the remote IT infrastructure is working properly at all times

Furthermore, as a service provider, the CSC will ensure that both staff and students can enjoy the following set of network services as those on the main campus which include:

  • Internet Service
  • File & Print Service
  • Video Service
  • IP Phone Service
  • Wireless LAN Service

Moving Forward

As set out in the IT Strategic Plan 2010-2015, the CSC will plan to strengthen and extend its support by establishing a common set of standardized network services and their corresponding service levels so that staff and students at remote offices and remote campuses can enjoy comparable, if not the same, quality of services. In particular, with more and more mobile devices and video services on the campus network, in order to achieve agility in network provisionings cost-effectively, the CSC will need to employ new technology to extend network services seamlessly to remote locations and to reduce latency during data transfer as well as to monitor and manage IT infrastructure remotely. In addition, the CSC plans to outsource on-site support to service providers whenever it is cost-effective to do so and will ensure adequate trainings be provided to local support staff at remote offices so as to reduce the support effort required from main campus to a minimum.

 

百家乐官网庄闲局部失衡| 网上百家乐官网公式| 注册百家乐送彩金 | 百家乐官网15人桌子| 百家乐的如何玩| 新全讯网| 玩百家乐是否有技巧| 百家乐官网游戏| 百家乐官网娱乐城博彩| 赌场百家乐视频| 百家乐官网tt娱乐平台| 百家乐英皇娱乐| 百家乐官网平台凯发| 百家乐3宜3忌| 扬州市| 百家乐官网赌博是否违法| 加多宝百家乐的玩法技巧和规则| 肯博88国际网| 菲律宾百家乐官网娱乐平台| 大发888在线娱乐加盟合作| 防伪百家乐官网筹码币套装| 江川县| 黄金城百家乐游戏| 皇冠现金网址| 百家乐官网游戏唯一官网网站 | 北京百家乐官网网上投注| 百家乐庄闲几率| gt百家乐官网平台假吗| 大发888新老虎机| 百家乐足球投注网哪个平台网址测速最好 | 百家乐官网马渚| 百家乐技巧介绍| 博马百家乐娱乐城| 百家乐官网的奥秘| bet365是否合法| 丽都百家乐官网的玩法技巧和规则| 威尼斯人娱乐城网址是| 百家乐技术辅助软件| 免费下百家乐官网赌博软件| 娱乐城官网| 澳门百家乐赌场网址|