百家乐怎么玩-澳门百家乐官网娱乐城网址_网上百家乐是不是真的_全讯网888 (中国)·官方网站

Water pH Neutralization Plant


Neutralization Plant


Description
All the sinks and floor drains in the lab areas on Floors 1, 2 and 4 of Yeung Kin Man Academic Building are connected by piping down to the Neutralization Plant, which is installed on the basement of the same building. The liquid waste is piped into one of the two fibre glass storage tanks (12m3 litres capacity each) alternatively. A water level controller inside each of the tanks controls the inlet motorized valve's open and close action, which in turn controls the liquid waste feeding into the tank. At any one time, only one tank will accept liquid waste. When a tank is filled up, its' inlet motorized valve will be closed and its' pH control stage will start. Meanwhile, the inlet motorized valve of the other tank will be open to accept wastewater.

Depending on the pH level of the wastewater, either sulphuric acid or sodium hydroxide will be dosed into the fibre glass storage tank by chemical dosing pumps, until the pH value reached the pre-set value of the 6.2~7.9 on the pH controller. The dosing of the chemicals is entirely automatic and controlled by a micro-processor controller. An agitator installed inside the tank is used for mixing the wastewater with the dosing chemicals. The chemical dosing system includes the pH level sensors installed inside the storage tanks, pH controller in the control panel, chemical dosing pumps, chemical storage tanks and feed pipes. All these are housed inside the neutralization plant room.

After the pH value is settled steadily at the pre-set value of 6.2~7.9, the neutralized wastewater will be discharged into the sewer by effluent pumps.

A sump pit with two submersible pumps has been provided inside the plant room to collect any water and/or chemicals overflow from the storage tanks, cleaning of floor and equipment; etc. The wastewater so collected will be fed into the storage tanks for neutralization before discharging to public sewer.

In cases when the Neutralization Plant is broken down due to either equipment failure, lack of dosing chemicals for neutralization purposes, piping leakage, etc., discharge of any wastewater into the system at very short notice.
 
Location
Basement of SC68, Yeung Kin Man Academic Building
 
Notes
Due to safety reasons, site visit can be arranged by advance booking.
 
Enquiry
Mr. Hardy Wong (CDO)
Tel: 3442 6791
Email : hardy.wong@cityu.edu.hk
 
Virtual Help Desk X
百家乐游戏什么时间容易出对| ez百家乐官网技巧| 邯郸百家乐园怎么样| 百家乐官网真人投注网站| 百家乐庄闲赢负表| 新世百家乐官网的玩法技巧和规则| 通海县| 娱乐城送38| 百家乐怎样算大小| 赌场风云国语| 马德里百家乐的玩法技巧和规则 | A8百家乐官网赌场娱乐网规则| 星港城百家乐官网娱乐城| 北流市| 百家乐博百家乐的玩法技巧和规则 | 百家乐有赢钱公式吗| 河池市| 娱乐城送钱| 老虎机加分器| 百家乐赌博娱乐城| 百家乐官网如何买大小| 娱乐城百家乐官网怎么样| 百家乐外挂| 全讯网找新全讯网| 百家乐庄闲偏差有多大| 百家乐投注网中国| 2016哪个属相做生意吉利| 百家乐官网如何计算| 网页百家乐官网游戏| 沈阳娱乐棋牌网| 娱乐城开户| 大发888出纳柜台 2014| 大发888是真的吗| 澳门赌博| VIP百家乐官网-挤牌卡安桌板| 百家乐官网在线投注系统| 百家乐官网翻天快播| 百家乐官网技巧-澳门百家乐官网官方网址 | 联众百家乐的玩法技巧和规则| 同花顺百家乐娱乐城| 巴登娱乐城开户|